NoProjectClient and locationValue (ZAR)
01Mbudzi InterchangeGrade separated interchange, 5 main bridges, 2 underpasses, 6 culverts, loops and ramps, approximately 24 km roadworks. Commissioned 30 May 2025.Harare, ZimbabweFlagship
0285 Anderson Street, MarshalltownEFR1107. Fire damaged barracks rehab plus 12 storey office tower, 16 m deep four level basement. Completion December 2026.Johannesburg CBDR420,000,000
03M2 Replacement of Finger Joints30 finger joints replaced under live traffic with a comprehensive traffic management plan, just over 10 months.JohannesburgR30,000,000
04Selby and Kazerne RehabilitationBridge replacement, corbel failure and AAR damage, full closure and diversion of 22,000 daily trips. Completed 30 October 2019.M2 Motorway, JohannesburgR192,000,000
05M1 Freeway, Bridges over Oxford and Federation RoadsBackwall reconstruction, retaining wall stabilisation, bearing rehab, stormwater redesign, 1 km carriageway reconstruction.SANRALR127,366,942.54
06Eskom Kusile Coal Transloading FacilityBridge, weighbridge and conveyor design, coal offloading facility, structural steel transloading, road and drainage design.Eskom, MpumalangaR310,000,000
07JRA Bridge Inspections and Strumans BMS UpdateInspection of over 800 bridges and culverts, system updates, identification of critical bridges for remedial action.JRA, City of JohannesburgR50,000,000
08JRA Visual Assessment of All RoadsRoad inspections, data collection and processing, road database administration.JRA, City of JohannesburgR136,000,000
09Heavy Rehabilitation of Road P122/1, 10 kmRoad design, drainage system design, project management, construction supervision.Elardus Park to Kempton ParkR52,113,621
10Mzilikazi River Bridge45 m three span design, pile design, flood hydrology and hydraulic design.River bridgeR50,159,863
11Nxumalo River Bridge45 m three span design, pile design, flood hydrology and hydraulic design, construction supervision.River bridgeR41,266,545.90
12Zulu River Bridge45 m three span design, pile design, flood hydrology and hydraulic design, construction supervision.River bridgeR50,858,845.71
13Kinini River Bridge45 m three span design, pile design, flood hydrology and hydraulic design, construction supervision.River bridgeR51,456,789.54
14Coleraine River Bridge45 m three span design, pile design, flood hydrology and hydraulic design, construction supervision.River bridgeR14,540,600.97
15Main River BridgeRiver bridge design, caisson pile design, flood hydrology and hydraulic design, construction supervision.River bridgeR18,912,145.80
16Niven River BridgeRiver bridge design, flood hydrology and hydraulic design, construction supervision.River bridgeR6,705,905.65
17Felstead River BridgeRiver bridge design, flood hydrology and hydraulic design, construction supervision.River bridgeR2,666,648.16